How we helped

SynchroGrid performed protection & control design and relay setting services for two generators and GSU differential relay replacements. We also replaced existing differential relays with new SEL-700G and SEL-787 relays. Our services included the following:

  • Protection and control substation design
    • Including one-lines, three-lines, DC schematics, and wiring diagrams
  • Relay settings development
    • For SEL-700G and SEL-787 relays, including typical generation protection such as loss of field, voltage/frequency protection, inadvertent energization, etc.
  • Field support

Interested in expanding your system protection capabilities? Let’s talk about your challenges and ways we can help to provide unparalleled system protection services. Give us a call.