Pattern Energy: Arc Flash Study

Category:

System Protection

Year:

2019

SynchroGrid performed an arc flash analysis for Pattern Energy

Cross Texas Transmission: Voltage Transformer Fault Analysis

Category:

System Protection

Year:

2019

SynchroGrid provided an analysis of the operation of a 345kV bus trip. 

Oncor Electric: Glenhaven Substation

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting development services for Oncor Electric at their Glenhaven Substation.

Oncor Electric: Castile Hills Substation

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting development and coordination services for Oncor Electric’s Castile Hills Substation.

Oncor Electric: West Texas Gulf Substation

Category:

System Protection

Year:

2018

SynchroGrid developed relay settings for transformer protection, bus protection, and feeder protection at Oncor Electric’s West Texas Gulf Substation. Relay coordination was also provided for the transformer and distribution feeder.

Oncor Electric: Cheyenne Substation

Category:

System Protection

Year:

2018

SynchroGrid developed relay settings for transformer protection, bus protection, feeder protection and bus tie protection at Oncor Electric’s Cheyenne Substation. Relay coordination was also provided for the transformer and distribution feeder.

Oncor Electric: Barstow Northwest Substation

Category:

System Protection

Year:

2018

SynchroGrid developed relay settings for transformer protection, bus protection, and feeder protection at Oncor Electric’s Barstow Northwest Substation. Relay coordination was also provided for the transformer and distribution feeder.

Pattern Energy: PRC-025-1 Compliance

Category:

NERC Compliance

Year:

2018

SynchroGrid performed engineering calculations to verify that relay settings are in compliance with PRC-025-1 for Pattern Energy wind farms located in the US.

Sharyland Utilities: NERC PRC-019-2 Compliance for Alibates Synchronous Condenser

Category:

NERC Compliance

Year:

2018

SynchroGrid performed engineering calculations for Sharyland Utilities to verify that the relay and limiter settings at the Alibates Substation were in compliance with NERC PRC-019-2.