CTT: 345kV Reactor Inrush DFR Solution

Category:

Substation Design

Year:

2017

SynchroGrid developed a DFR solution to monitor reactor inrush currents. This will enable CTT to build a database of waveform signals to analyze and detect abnormal conditions.

NRG: ERCOT RARF Submission

Category:

System Protection

Year:

2017

SynchroGrid provided a relay settings review for the ERCOT Region. This was for ERCOT RARF 5.4.

CTT: 345kV Railhead Reactor Addition

Category:

System Protection

Year:

2017

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Railhead reactor additions.

CTT: 345kV Gray-Allen Creek Line Addition

Category:

System Protection

Year:

2017

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Gray to Allen Creek line additions.

CTT: 345kV Gray Shunt Reactor Upgrade

Category:

System Protection

Year:

2017

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Gray shunt reactor upgrades.

BTU: Transformer Relay Upgrade

Category:

System Protection

Year:

2016

SynchroGrid provided substation design services to upgrade four transformer relays, as well as used mathematical equations to create a separate differential function to differentiate faults between zone 1 and zone 2.

BTU: NERC PRC-019-2

Category:

NERC Compliance

Year:

2016

SynchroGrid conducted a coordination review utilizing compliance of NERC PRC-019-2 at Roland C. Dansby Power Plant.

Pattern: NERC PRC-025-1 Compliance

Category:

NERC Compliance

Year:

2016

SynchroGrid reviewed protection relay settings for Pattern Energy's Panhandle substation. 

BTU: Generator Unit Review

Category:

System Protection

Year:

2016

SynchroGrid conducted a review of three generator units for Bryan Texas Utilities.

Load More