Sharyland Utilities: NERC PRC-019-2 Compliance for Alibates Synchronous Condenser

Category:

NERC Compliance

Year:

2018

SynchroGrid performed engineering calculations for Sharyland Utilities to verify that the relay and limiter settings at the Alibates Substation were in compliance with NERC PRC-019-2.

Sharyland Utilities: NERC PRC-019-2 Compliance for Tule Canyon Synchronous Condenser

Category:

NERC Compliance

Year:

2018

SynchroGrid performed engineering calculations for Sharyland Utilities’ Tule Canyon Substation to verify that relay and limiter settings were in compliance with NERC PRC-019-2.

Oncor Electric: Cowden North Substation

Category:

System Protection

Year:

2018

SynchroGrid developed extensive relay settings for Oncor Electric's Cowden North Substation. In addition, we provided relay coordination for the transformer and distribution feeder. 

Oncor Electric: Alkali Lake Substation Relay Settings

Category:

System Protection

Year:

2018

SynchroGrid developed extensive relay settings as well as relay coordination for Oncor Electric's Alkali Lake Substation. 

BTU: Nall Lane Substation

Category:

Substation Design

Year:

2018

SynchroGrid replaced a distribution transformer and a relay panel at the BTU Nall Lane substation. 

Oncor Electric: Odessa North Substation

Category:

System Protection

Year:

2018

SynchroGrid provided relay settings services for the entire 138:12.47kV Substation. 

 

BTU: Enterprise Substation Relay Setting Development & Review

Category:

System Protection

Year:

2017

SynchroGrid provided quality system protection services in developing settings for a number of local terminals including Enterprise, TAMU, and Dowling terminals.

NRG: Generator NERC-PRC-025-1 Compliance Review

Category:

NERC Compliance

Year:

2017

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

Category:

NERC Compliance

Year:

2017

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.

Load More