SynchroGrid performed engineering calculations to verify that relay settings were in compliance with PRC-025-2 for four Cottonwood generation units located in Texas. Responsibilities included reviewing relay one-lines, three-lines, and applicable relay settings, performing calculations to verify relay settings were in compliance with PRC-025, suggesting settings changes for non-compliant relays, and creation of compliance reports.

Similar projects

Rayburn Country Electric Cooperative: PRC-027-1 Wide Area Coordination (WAC)

SynchroGrid performed a wide area coordination study to ensure compliance with PRC-027-1 Requirement 2.

Pattern Energy: PRC-025-1 Compliance

SynchroGrid performed engineering calculations to verify that relay settings are in compliance with PRC-025-1 for Pattern Energy wind farms located in the US.

Sharyland Utilities: NERC PRC-019-2 Compliance for Alibates Synchronous Condenser

SynchroGrid performed engineering calculations for Sharyland Utilities to verify that the relay and limiter settings at the Alibates Substation were in compliance with NERC PRC-019-2.

Sharyland Utilities: NERC PRC-019-2 Compliance for Tule Canyon Synchronous Condenser

SynchroGrid performed engineering calculations for Sharyland Utilities’ Tule Canyon Substation to verify that relay and limiter settings were in compliance with NERC PRC-019-2.

CTT: PRC-027-1 Wide Area Coordination (WAC)

SynchroGrid performed a wide area coordination for CTT’s 345kV system.

CTT: Replacement of Reactor Relays at Gray Substation

SynchroGrid developed relay settings to replace reactor relays (GE-T60 and SEL-487E-0 were replaced with SEL-387E and SEL-487E-3) and updated drawings, control schematics, and GOOSE architect files to coordinate communications.

Pattern Energy: NERC PRC IESO Scope Addition

SynchroGrid performed engineering calculations for a number of Pattern wind farms in Ontario.

NRG: Generator NERC-PRC-025-1 Compliance Review

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.