NERC PRC-019-2 is intended to verify coordination of generating unit facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and protection system settings.

 

On generator 2 at Roland C. Dansby Power Plant for Bryan Texas Utilities, we conducted a review of coordination between

  • generator capabilities
  • limiters
  • protection devices

Similar projects

CTT: NERC PRC-002-2 Compliance

SynchroGrid reviewed substation settings to ensure compliance with NERC PRC-002-2 for Cross Texas Transmission.

BTU: Nall Lane Substation

SynchroGrid replaced a distribution transformer and a relay panel at the BTU Nall Lane substation. 

Pattern: NERC PRC-025-1 Compliance

SynchroGrid reviewed protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-024-2 Compliance

SynchroGrid reviewed the protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-019-2 Compliance

SynchroGrid performed engineering calculations to verify that relay settings were in compliance with NERC PRC-019-2 for all wind farms located in the United States.

ACCIONA: NERC PRC-025-1 Compliance

SynchroGrid implemented NERC PRC-025-1 Generator Relay Loadability to assess load response settings. 

BTU: NERC PRC-005-6

SynchroGrid created standard relay maintenance procedures and documentation to ensure compliance with NERC PRC-005-6 for Bryan Texas Utilities. 

BTU: NERC PRC-024-2 Review

SynchroGrid reviewed the protection relay settings for Bryan Texas Utilities to ensure compliance with PRC-024-2.

NRG: Generator NERC-PRC-025-1 Compliance Review

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.