SynchroGrid conducted a compliance review of the frequency and voltage settings for Bryan Texas Utilities. 

 

Our team provided recommended modifications to the settings and further assisted with updating and testing the recommended changes per the PRC standard. 

Similar projects

BTU: NERC PRC-019-2

SynchroGrid conducted a coordination review utilizing compliance of NERC PRC-019-2 at Roland C. Dansby Power Plant.

CTT: NERC PRC-002-2 Compliance

SynchroGrid reviewed substation settings to ensure compliance with NERC PRC-002-2 for Cross Texas Transmission.

Pattern: NERC PRC-025-1 Compliance

SynchroGrid reviewed protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-024-2 Compliance

SynchroGrid reviewed the protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-019-2 Compliance

SynchroGrid performed engineering calculations to verify that relay settings were in compliance with NERC PRC-019-2 for all wind farms located in the United States.

ACCIONA: NERC PRC-025-1 Compliance

SynchroGrid implemented NERC PRC-025-1 Generator Relay Loadability to assess load response settings. 

BTU: NERC PRC-005-6

SynchroGrid created standard relay maintenance procedures and documentation to ensure compliance with NERC PRC-005-6 for Bryan Texas Utilities. 

NRG: Generator NERC-PRC-025-1 Compliance Review

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.