PRC-005-6 is the protection system automatic reclosing and sudden pressure relaying maintenance standard for NERC. It is intended to require documentation and implementation programs for the maintenance of all protection systems, automatic reclosing, and sudden pressure relaying affecting the reliability of the bulk system so that they are kept in working order.

For BTU, SynchroGrid created standard relay maintenance procedures and documentation to implement organization and efficiency within all necessary testing items and records for compliance per PRC-005-6 standards.

By offering services to review and correct PRC standards, SynchroGrid can ensure correct implementation of the standards, which provides compliance with NERC and greater success of the facility. 

Similar projects

BTU: NERC PRC-019-2

SynchroGrid conducted a coordination review utilizing compliance of NERC PRC-019-2 at Roland C. Dansby Power Plant.

CTT: NERC PRC-002-2 Compliance

SynchroGrid reviewed substation settings to ensure compliance with NERC PRC-002-2 for Cross Texas Transmission.

BTU: Nall Lane Substation

SynchroGrid replaced a distribution transformer and a relay panel at the BTU Nall Lane substation. 

Pattern: NERC PRC-025-1 Compliance

SynchroGrid reviewed protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-024-2 Compliance

SynchroGrid reviewed the protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-019-2 Compliance

SynchroGrid performed engineering calculations to verify that relay settings were in compliance with NERC PRC-019-2 for all wind farms located in the United States.

ACCIONA: NERC PRC-025-1 Compliance

SynchroGrid implemented NERC PRC-025-1 Generator Relay Loadability to assess load response settings. 

BTU: NERC PRC-024-2 Review

SynchroGrid reviewed the protection relay settings for Bryan Texas Utilities to ensure compliance with PRC-024-2.

NRG: Generator NERC-PRC-025-1 Compliance Review

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.