NERC PRC-025-1 is intended to set load responsive protective relays associated with generation facilities at a level to prevent unnecessary tripping of generators during a system disturbance for conditions that do not pose a risk of damage to the associated equipment.

For ACCIONA, SynchroGrid reviewed the load response settings at their wind farm to detect and correct any unnecessary tripping during certain conditions. 

Providing NERC PRC compliance reviews is a service that SynchroGrid is proud to supply to our clients to ensure their compliance within the industry and the success of their facilities. 

Similar projects

BTU: NERC PRC-019-2

SynchroGrid conducted a coordination review utilizing compliance of NERC PRC-019-2 at Roland C. Dansby Power Plant.

Pattern Energy: PRC-025-1 Compliance

SynchroGrid performed engineering calculations to verify that relay settings are in compliance with PRC-025-1 for Pattern Energy wind farms located in the US.

Sharyland Utilities: NERC PRC-019-2 Compliance for Alibates Synchronous Condenser

SynchroGrid performed engineering calculations for Sharyland Utilities to verify that the relay and limiter settings at the Alibates Substation were in compliance with NERC PRC-019-2.

Sharyland Utilities: NERC PRC-019-2 Compliance for Tule Canyon Synchronous Condenser

SynchroGrid performed engineering calculations for Sharyland Utilities’ Tule Canyon Substation to verify that relay and limiter settings were in compliance with NERC PRC-019-2.

CTT: NERC PRC-002-2 Compliance

SynchroGrid reviewed substation settings to ensure compliance with NERC PRC-002-2 for Cross Texas Transmission.

Pattern: NERC PRC-025-1 Compliance

SynchroGrid reviewed protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-024-2 Compliance

SynchroGrid reviewed the protection relay settings for Pattern Energy's Panhandle substation. 

Pattern: NERC PRC-019-2 Compliance

SynchroGrid performed engineering calculations to verify that relay settings were in compliance with NERC PRC-019-2 for all wind farms located in the United States.

BTU: NERC PRC-005-6

SynchroGrid created standard relay maintenance procedures and documentation to ensure compliance with NERC PRC-005-6 for Bryan Texas Utilities. 

BTU: NERC PRC-024-2 Review

SynchroGrid reviewed the protection relay settings for Bryan Texas Utilities to ensure compliance with PRC-024-2.

NRG: Generator NERC-PRC-025-1 Compliance Review

SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance. 

Pattern: Wind Farm System Protection Compliance Review

SynchroGrid performed extensive calculations for wind farms across Canada to ensure that their relay settings were in compliance with a number of NERC-PRC standards.