SynchroGrid provided a relay setting review to find the relay loadability MVA for all generator units in the ERCOT region. This was for Ercot RARF 5.4.

SynchroGrid: 

  • Gathered data
  • Reviewed data
  • MVA calculations
  • Prepared report with final calculations 

Similar projects

CTT: 345kV Railhead Reactor Addition

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Railhead reactor additions.

CTT: 345kV Gray-Allen Creek Line Addition

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Gray to Allen Creek line additions.

CTT: 345kV Gray Shunt Reactor Upgrade

SynchroGrid provided relay settings and GOOSE messaging review along with quality control for Cross Texas Transmission's Gray shunt reactor upgrades.

Cross Texas Transmission: Voltage Transformer Fault Analysis

SynchroGrid provided an analysis of the operation of a 345kV bus trip. 

Relay Settings for Transformer Feeder and Distribution Feeder

SynchroGrid provided relay settings services for the entire 138 : 12.47kV Substation. 

 

Relay Settings Development and Coordination Study

SynchroGrid provided relay setting and relay coordination services for a local substation. 

Relay Settings for Retrofit Transformer Panel Upgrades

SynchroGrid provided relay setting development services to upgrade two retrofit transformer panels.

Extensive Relay Setting Development and Coordination Services

SynchroGrid developed extensive relay settings as well as relay coordination for a local substation. 

Relay Settings and Coordination Services

SynchroGrid developed relay settings for transformer protection, bus protection, and feeder protection at a local substation. Relay coordination was also provided for the transformer and distribution feeder.

CTT: SEL-487E Reactor Relays Replacement

SynchroGrid upgraded SEL 487E-0 Reactor relays with SEL-487E-3 relays.

CTT: T60 Relay Replacement

SynchroGrid replaced GE-T60 reactor relays with SEL-387E relays and upgraded SEL 487E-0 reactor relays with SEL-487E-3 relays.

Substation Feeder Addition

SynchroGrid provided relay setting and relay coordination services for a local  substation.

Relay Setting Development for Local Substation

SynchroGrid provided relay setting development services for a local substation.

Pattern Energy: South Kent Wind Arc Flash

SynchroGrid performed an arc flash analysis on the electrical distribution system for South Kent Wind Farm - a wind farm operated by Pattern Energy.

Pattern Energy: Panhandle 2 Wind Arc Flash

SynchroGrid performed an arc flash analysis on the electrical distribution system for a wind farm operated by Pattern Energy.

Relay Settings and Relay Coordination for Local Substation

SynchroGrid developed relay settings and provided relay coordination services for a local substation.

Relay Settings for Feeder and Bus Tie Protection

SynchroGrid provided relay settings for a local substation.

BTU: Enterprise Substation Relay Setting Development & Review

SynchroGrid provided quality system protection services in developing settings for a number of local terminals including Enterprise, TAMU, and Dowling terminals.

Pattern Energy: Arc Flash Study

SynchroGrid performed an arc flash analysis for Pattern Energy.

CTT: Transmission Line Relay Firmware Upgrade

This project consisted of verifying the adequacy and reliability of new features and settings along with existing settings within the firmware upgrade.

Extensive Relay Setting Development for Texas Utility

SynchroGrid provided quality relay setting development services by creating new settings for relays at five substations for a Texas utility.